Framing reference

What framing costs in Michigan, by project type

Rough framing labor in Michigan runs roughly $7 to $14 per square foot of finished floor area. Material, when you buy it, adds another $18 to $28 per square foot for a wood-framed house. A 2,000 square foot single-story house typically lands around $26,000 to $28,000 in labor and $36,000 to $56,000 in material, so $62,000 to $84,000 all in.

  • Fully insured
  • SAM.gov registered
  • Firm quote within 24 hours of plans
  • Last updated: September 2026

Those are the numbers Mavericks actually quotes, not a national average. Here is how they break down and what moves them. The full scope is on the rough framing page.

Labor and material are separate questions

Most framing work in Michigan is sold labor only. The builder or homeowner buys the lumber package through their own supplier, it gets delivered to the site, and the framing crew assembles it.

This matters for budgeting because the two halves behave differently. Labor is fairly predictable and is quoted from plans. Material tracks the lumber market and can move 20 percent in a season. When somebody quotes you "framing," ask which one they mean.

Framing cost by project type

ProjectTypical laborNotes
New house, 1 story, 2,000 SF$26,000 to $28,000Moderate complexity, standard roof
New house, 2 story, 2,500 SF$32,000 to $42,000Second floor system adds labor
Addition, 400 SF$5,600 to $8,800$14 to $22 per SF. Tie-in to existing structure drives cost
Garage, 2 car detached$3,200 to $7,500$8 to $13 per SF on 400 to 576 SF. Slab on grade, trussed roof
Basement framing$22 to $30 per linear foot8 foot walls. See below, or the basement framing page.
Wall removal with LVL or steel beam$2,500 to $9,000Depends on span, load and access

Material, when you are buying it rather than your builder, typically adds $18 to $28 per square foot on new construction.

Basement framing is priced differently

Basements are priced by the linear foot of wall, not by square foot of floor, because the floor area is already there and the work is walls.

ItemRate
Walls, 8 foot$22 to $30 per linear foot
Walls, 9 footMultiply by 1.10
Walls, 10 footMultiply by 1.20
Soffits and bulkheads$24 to $34 per linear foot
Bathroom rough framingAdd $600
Job minimum$1,500

A typical 200 linear foot basement of perimeter and partition walls runs about $5,000 in labor, done in one long day: 200 linear feet of wall, three framers, one ten hour day.

What actually moves the price

Five things, in order of how much they matter.

  1. Roof complexity. A simple gable is fast. Hips, valleys, dormers and multiple ridge heights add days. This is the single biggest swing factor and it is why square footage alone cannot price a job.
  2. Ceiling height and wall height. Nine and ten foot walls cost more than eight, and not proportionally. Everything gets heavier and slower.
  3. Site access. If a truck and a telehandler can get to the building, the job is faster. A tight lot, a steep grade or a long carry adds hours to every delivery.
  4. Engineered members. LVL beams, steel beams and columns take planning, equipment and crew. Installing a W8x31 is a different day than nailing studs.
  5. Plan quality. A complete, dimensioned, engineered set prices tighter and builds faster. A napkin sketch gets a padded number, because the unknowns have to be priced.

What is included, and what is not

Included in Mavericks rough framing:
Floor systems, wall framing, roof systems and truss setting, sheathing, window and door openings, LVL and steel beam and column installation (install only), and house wrap.

House wrap is part of the framing scope. It is never listed as an exclusion and never billed again under siding.

Not included by default:
Material, unless quoted as labor plus material. Equipment such as a telehandler or Skytrak, which is priced as its own line item rather than buried in the labor rate. Permits. Foundation, concrete flatwork, and any trade after framing.

Steel: Mavericks installs steel beams and columns. It does not fabricate, weld or coat steel. That is a separate trade.

How this compares to national numbers

HomeGuide's 2026 framing cost data puts national framing labor at $7 to $13 per square foot and total framing at $22,000 to $60,000 for a 2,000 square foot house.

Michigan labor sits at the upper half of that range, and Metro Detroit higher still. That is a real cost-of-labor difference, not a markup. Crews that show up on the committed date and hand off a frame with no punch list are paid accordingly, and that has to be in the number for them to still be there next season.

Frequently asked questions

What does it cost to frame a 2,000 square foot house in Michigan?

Labor runs about $26,000 to $28,000 for a single story of moderate complexity. Material adds roughly $36,000 to $56,000 if you are buying it. Total is about $62,000 to $84,000. A complex roof or nine foot walls push the labor higher.

Is framing quoted by square foot or by the job?

Framing is quoted by the job, after reading the plans. Square foot figures are useful for budgeting but they cannot see roof complexity, wall height or site access, which is where the real cost variation lives.

Does the framer buy the lumber?

Usually not. Labor only is the normal arrangement in Michigan. The builder orders the package through their own supplier and the framing crew assembles it. Mavericks provides the list of what to order. Labor plus material is available on request and usually fits homeowners better.

Why do two framing quotes for the same house differ so much?

Two framing quotes for the same house almost always differ on scope, not rate. One includes sheathing and house wrap and the other does not. One includes truss setting and the other assumes a crane crew. Compare inclusion lists before comparing prices.

How much does basement framing cost?

Basement framing labor costs $22 to $30 per linear foot of wall at eight feet, with a $1,500 job minimum. A 200 linear foot basement is roughly $5,000 in labor. Soffits and bulkheads are $24 to $34 per linear foot.

Do these prices include equipment?

No, framing labor prices do not include equipment. A telehandler or Skytrak is quoted as a separate line so you can see it and decide. Rental runs $2,000 a week or $4,000 a month. Most builders provide their own.